A.G. Peltz Group, LLC placed 62,151 SY of 7” RCC at the Coca Cola South Metro Sales Warehouse in Union City, GA. The project was completed in February of 2019. Material was mixed using an Aran 280C Pugmill and placed with both a Vogele 2100 and an ABG Titan 8820 High Density Paver. This site was complex due to the paving layout and numerous obstacles, including drains, valves, and fire hydrants. This required significant site coordination between the prime contractor, Brasfield and Gorrie, as well as the grading contractor, Plateau Excavating. Paving widths varied from 12’ to 24.5’ feet and transverse saw cuts were generally at 12-15 feet. The surface was troweled finished and standard troweling machine. National Cement supplied the powder for this project.
A.G. Peltz Group teamed up with B&G to place RCC on a 2nd Coca Cola Facility in 2020 in Tifton, GA. This project consisted of 32,155 SY of 7″ Paving.
- Client: Coca-Cola Bottling Company
- Designer: Design Group Facility Solutions
- General Contractor: Brasfield and Gorrie