Dal Tile


A.G. Peltz Group, LLC placed 43,000 of 8” RCC for a Dale Tile distribution facility in 2016 in Dickson, TN. The paving was completed using an ABG Titan 8820 with varied paving widths (8’-24.5’) due to various obstacles at the site. AGP also poured a concrete apron around the building prior to starting paving operations.

AGP used a 3 aggregate blend of #7’s, #8’s and manufactured sand from Vulcan Material’s Dickson Quarry. Cemex supplied the cement on the project. Compressive strength requirements of 4000 PSI at 28 days were routinely exceeded at 7 days (average 4,500). Vaughn Contractors, Inc. was the prime contractor.