Bayport Container Yard VII (CY7)- Port Houston

A.G. Peltz Group, LLC (AGP) placed another 90,000 + cubic yards of 18″ thick RCC at the Port Houston Bayport Facility.  The project was placed in two equal 9″ RCC lifts and production rates routinely exceed 1,200 cubic yards per day.  Project supplier partners included: Vulcan Materials, Ashgrove Cement, Charah, […]


Dal Tile

A.G. Peltz Group, LLC placed 43,000 of 8” RCC for a Dale Tile distribution facility in 2016 in Dickson, TN. The paving was completed using an ABG Titan 8820 with varied paving widths (8’-24.5’) due to various obstacles at the site. AGP also poured a concrete apron around the building […]


Honda RCX

A.G. Peltz Group, LLC placed 43,445 square yards of 7 & 10 inch RCC at the Honda Facility in Lincoln, Al in 2017/18. Since the inaugural project back in 2000, the Honda Lincoln facility has utilized close to two million square yards of RCC, making in the largest RCC Paving […]


TLT Empties Yard

AGP placed 4,500 cubic yards of 17” and 37,000 cubic yards of 12” RCC for a new empties yard container facility at Bayport. This design build project was unique public/private partnership between Port Houston and Terminal Link Texas (TLT). The final product provided TLT a 25-acre empties yard inside the […]


KCS Salinas Victoria Intermodal Facility

A.G. Peltz Group provided the RCC paving for the reconstruction of the intermodal facility at Salinas Victoria, Mexico. The container yard consisted of 100,110 square yards of 17” RCC pavement and was constructed while the facility was in operation. A.G. Peltz Group worked with the owner to develop a paving […]


Georgia Biomass Wood Pellet Plant

44,950 square yards of 15” RCC and 32,150 square yards of 9” RCC for a new wood pelletizing plant. Georgia Biomass selected RCC in lieu of asphalt based on the extremely high loading and expected reduction in maintenance cost with utilizing RCC.


KCS Kendleton Intermodal Facility

The project consisted of 14” RCC for packer pads and 17″ RCC for the gantry crane wheel path as well as 6″ RCC for the trailer storage. Phase I and Phase II combined to approximately 50,000 cubic yards of 650 PSI flexural and 4,500 PSI compressive. In addition, Peltz placed […]


Honda Logistics Improvements

125000 square yards of 7″ RCC pavement for the Honda Logistics Improvements at the Lincoln, AL manufacturing facility. A.G. Peltz Group LLC was responsible for all site paving and base construction on the project. Paving system utilized 4″ of cement treated base which allowed the owner to use completed base […]